Tokke发电厂 is located in Tokke Municipality in Vestfold and Telemark County.
-
1961投入使用
-
430 MW装机容量
-
2,350.3、妇女年生产
The first generating unit at Tokke was commissioned in 1961. The water travels through a 17-kilometre-long tunnel from Lake Vinjevatn to the outlet in Lake Bandak. The second, third and fourth generating units at Tokke were commissioned in 1962.
When it was built, Tokke was the largest power plant in 挪威. The Tokke operations centre was also the first in 十大最好的网赌平台 where several power plants were controlled from the same place.
All four generating units have Francis turbines and together they give Tokke发电厂 an installed capacity of 430 MW.
With its distinctive architecture, location and technical solutions, Tokke发电厂 has several features that are proposed to be protected under 十大最好的网赌平台's conservation plan. These include the crane building, reception building and the operating centre referred to above.
公司 | 所有权份额 |
十大最好的网赌平台 | 100% |